Upgrading semi-buried substations, LR71 substation and RMU
Project details:
Procurement and installation of automation equipment, as well as remote stations for upgrading existing medium-voltage plants (10 kV) – ring main units, which created conditions for remote monitoring and control of medium-voltage plants and their integration within the SDU.
Start/completion year:
2017 – 2019
Location:
Belgrade– 28 locations
Investor:
ODS EPS Distribucija,
Belgrade Branch
Project details
Technical information
Existing medium-voltage plants – ring main units have two or more line bays equipped with switch disconnectors and one or two transformer bays with switches and corresponding protective devices or switch disconnectors. Within the low-voltage plants – ring main units, which are located within the semi-buried substations, multifunctional measuring devices manufactured by Schneider Electric are provided, which are installed on the low-voltage side of the substation in the transformer bay. The measuring devices have a serial port RS-485 with MODBUS protocol support, which is used for connection to the corresponding port at the remote station for their integration into the remote monitoring and control system.
Social and economic interest
The substation is located in a densely populated part of the city where it provides better electricity supply. It reduces power supply problems.
Instrument cabinets and electrical meters including installation thereof
Project description:
Delivery and installation of a displaced measuring point (installation of a new polyester cabinet with an electrical meter and required cable connections).
Start/completion year:
2014 – 2014
Location:
Aranđelovac, Valjevo, Jagodina, Ćuprija, Paraćin, Svilajnac, Kraljevo, Kruševac, Lazarevac, Loznica, Užice, Šabac
Investor:
EPS – Elektrosrbija Kraljevo
Project details:
Technical information
MO 1, MO 2 and MO 4 polyester cabinets were installed on the poles in the low-voltage network.
New electrical meters with DLMS protocol, new feeder cables and new cables to consumer facilities were installed.
This project covered about 5000 consumers.
Social and economic interest
The grounds for implementation of this project refers to heavy floods that compromised regular electricity supply to consumers. At the same time, EPS’s long-term plan was implemented – moving electrical meters to public surfaces for the purpose of unhindered access to make readings, etc.
Reactive maintenance of 110 kV, 35 kV, 20 (10) kV and 1 kV power facilities
Project description:
Reactive maintenance, overhaul and remediation at 110, 35, 20(10) and 1 kV power facilities.
Start/completion year:
2013 – 2016
Location:
Kraljevo
Investor:
EPS – Elektrosrbija Kraljevo
Project details
Technical information
- Defects remediation resulting from faults on MV and LV lines
- Remediation of functionality faults and defects in 110, 35 and 10 kV substations
- Maintenance of MV and LV lines (replacement of conductors, insulators, poles, overgrowth removal, foundation remediation)
- Maintenance of 110, 35(20)10 kV substations – circuit breaker, transformer revising, HV equipment maintenance.
Social and economic interest
- Maintaining consumer power supply consistency
- Extending equipment service life by timely maintenance
- Preventing breakdowns and reducing losses
Kragujevac Investments
Project description:
Electrical installation works and procurement of materials for construction and reconstruction of 10(20) and 1 kV power facility connections and measuring points – Kragujevac.
Start/completion year:
2016 – 2018
Location:
Kragujevac, Požarevac, Smederevo
Investor:
ODS EPS Distribucija,
Kragujevac Branch
Project details
Technical information
Electrical installation works and procurement of materials for construction and reconstruction of 10(20) and 1 kV power facility connections and measuring points – Kragujevac.
Social and economic interest
Over 150 km of low-voltage network, 100 km of 10 kV power lines, 55 distribution substations, 5000 relocated measuring points and over 2000 household connections were made, which contributed to the improvement of voltage conditions in the distribution networks and the reduction of losses.
Construction and reconstruction of power facilities
Project description:
Power line reconstruction works.
Godina početka/završetka:
2016 – 2018
Location:
Kraljevo, Krusevac, Jagodina, Novi Pazar
Investor:
ODS EPS Distribucija, Kraljevo, Kruševac, Jagodina, Novi Pazar branches
Project details
Technical information
- Construction of connections and displaced measuring point for customers
- Construction of overhead and underground power lines and low-voltage network
- Construction of pole-mounted and precast concrete substations
Social and economic interest
- Establishing stable voltage conditions for consumers
- Extensions of existing HV and LV networks
- Ensuring power supply to new individual customers and industrial facilities
- Reducing losses in distribution networks
Remote control in MV network
Project description:
Adaptation of a steel lattice tower with a load break switch on Bački Gračac outgoing feeder, connection to Kruščić.
Start/completion year:
2014 – 2016
Location:
Bački Gračac, Odžaci
Investor:
Elektrovojvodina – ED Sombor
Project details
Technical information
- The existing line disconnector was disassembled and a new remote-controlled load break switch for outdoor mounting was installed
- “Primary – power” equipment was installed adapted for connection to the remote monitoring and control system
- Appropriate telecommunication equipment (radio station, antenna, etc.) for communication with the superior dispatch centre was also installed
Social and economic interest
Connection to the remote monitoring and control system.
CURRENT PROJECTS
REACTIVE
MAINTENANCE KRALJEVO
Investor: EPS
Location: Kraljevo
Start: 2017
Project details:
Reactive maintenance of 20/10 and 1 kV
for Kraljevo distribution area
REVISION AND OVERHAULS
KRALJEVO
Investor: EPS
Location: Kraljevo
Start: 2017
Project details:
Revision and overhauls of 20/10 and 1 kV for
Kraljevo distribution area
REVISION, OVERHAULS AND
REACTIVE
MAINTENANCE
KRALJEVO
Investor: EPS
Location: Kraljevo
Start: 2017
Project details:
Revision, overhaul and reactive
maintenance of 110 kV and 35 kV
for Kraljevo distribution area
CONSTRUCTION AND RECONSTRUCTION KRALJEVO,
KRUŠEVAC, JAGODINA
AND NOVI PAZAR
Investor: ODS EPS Distribucija
Location: Kraljevo, Kruševac, Jagodina, Novi Pazar
Start: 2018
Project details:
Electric installation work execution
and procurement of materials for construction and reconstruction of
10(20) and 1 kV power facility connections and measuring points – Kraljevo, Kruševac, Jagodina and Novi Pazar
CONSTRUCTION AND
RECONSTRUCTION
KRAGUJEVAC
Investor: ODS EPS Distribucija
Location: Kragujevac, Požarevac, Smederevo
Start: 2019
Project details:
Electric installation work execution
and procurement of materials for construction
and reconstruction of 10(20) and 1 kV power facility connections
and measuring points – Kragujevac
PROCUREMENT, CONSTRUCTION AND RECONSTRUCTION KRALJEVO, KRUŠEVAC, JAGODINA
NOVI PAZAR
Investor: ODS EPS Distribucija
Location: Kraljevo, Kruševac, Jagodina, Novi Pazar
Start: 2019
Project details:
Electric installation work execution and
procurement of materials for construction and reconstruction of 10(20) and 1 kV power facility connections and measuring points – Kraljevo, Kruševac, Jagodina and Novi Pazar
110 kV KRUŠEVAC 1 SUBSTATION –
KRUŠEVAC 3 SUBSTATION
Investor: EMS
Location: Kruševac
Start: 2018
Project details:
Construction of 110 kv cable line from
Kruševac 1 Substation to Kruševac 3 Substation
BANCAREVO AND
SARLAH TUNNELS
Investor: ODS EPS Distribucija
Location: Bancarevo, Svrljig
Start: 2017
Project details:
10 kV Bancarevo underground line
and Sarlah Tunnel, Corridor 10