Adrani camp
Project description:
Construction of a 10 kV cable line “TS 110/10 kV Kraljevo 5 – TS 10/0.4 kV Adrani Camp” for the facility of the temporary construction site “Kraljevo”, length 5744 m, for the construction of the highway E-761, Pojate – Preljina (Morava corridor).
Year of beginning/completion:
2022 -2023
Location:
Adrani, City of Kraljevo
Investor:
Bechtel Enka UK Limited, branch Belgrade
Project details
Project Details
The 10 kV cable in question is connected to the corresponding 10 kV outlet cell in TS 110/10 kV “Kraljevo 5″ on one side, and on the other side it is connected to the outlet cell TS 10/0.4 kV ” Adrani Camp “. According to the situational plan, the route of the cable line is planned partly through the existing cable channel, partly freely in the ground.
Social and economic interest
The cable supplied the transformer station “Adrani Camp”, which serves to supply the construction site “Kraljevo”, for the construction of the highway E-761, Pojate – Preljina (Morava Corridor). After the completion of the highway, the transformer station will remain at the location and will serve to power the Kraljevo industrial zone.
CURRENT PROJECTS
110 kV CABLE LINE SUBSTATION BEOGRAD 1 – SUBSTATION BEOGRAD 6
Investor: EMS AD
Location: Belgrade
Start: 2021
Project details::
Delivery of equipment and execution of construction works for the construction of a 110 kV cable line from Substation Beograd 1 to Substation Beograd 6.