Remote control in MV network
Secondary Distribution Network · Bački Gračac, Odžaci · 2014 – 2016
The remote control in MV network project was carried out in 2014-2016 at Bački Gračac, Odžaci, under investor Elektrovojvodina – ED Sombor. It included adaptation of a steel lattice tower with a load break switch on Bački Gračac outgoing feeder, connection to Kruščić.
- The existing line disconnector was disassembled and a new remote-controlled load break switch for outdoor mounting was installed
- “Primary – power” equipment was installed adapted for connection to the remote monitoring and control system
- Appropriate telecommunication equipment (radio station, antenna, etc.) for communication with the superior dispatch centre was also installed
Connection to the remote monitoring and control system.