Substations · Obrenovac, Belgrade, Kruševac · 2014 – 2015

Protection and control of 400/220 kV Obrenovac Substation, 400/110 kV Beograd Substation and 220/110 kV Kruševac 1 Substation. The project was carried out in 2014-2015 under investor EMS.

Delivery and installation of equipment and cabinets for protection and control of 400/220 kV Obrenovac Substation, 20 400/110 kV Beograd Substation and 220/110 kV Kruševac 1 Substation. Complete equipment installation, wiring and testing of cabinets according to technical documentation.

Delivery, replacement and installation of the given cabinets has increased the reliability of protection in the power system, and therefore the consistency and quality of the delivered electricity.