Performance of the electrical works on Sector 4 in Lipak and Železnik tunnels
Special Purpose Projects · Belgrade · 2020 – 2021
The electrical works on Sector 4 in Lipak and Železnik tunnels were carried out in 2020-2021 in Belgrade, under investor Azvirt doo Ogranak Beograd (Azvirt doo Belgrade Branch). Lipak and Železnik tunnels, located on the Pan-European corridor (Corridor X) of the E-75 motorway, on the southern bypass around Belgrade, are of vital importance for the smooth and safe traffic flow. These facilities are composed of two tunnel tubes with two traffic lanes and one breakdown lane each.
Construction of bypass around Belgrade, on Sector 4 between the bridge on Sava River near Ostružnica and Orlovača junction, represents at the moment one of the most important infrastructure projects in the Serbian capital.
Execution of almost a half-century-old project was preceded by the review of project documentation that was needed to be adjusted to the current site conditions, contemporary standards and the existing legal regulations. Thanks to the dedication of all project participants, their willingness for an unconditional cooperation for the sake of common interest, the obstacles were transformed into challenges. The idea of building a bypass and alleviating the traffic congestions in the capital is now becoming a reality which leads to the improvement of entire core infrastructure in the country, as well as to the increase in life quality, reducing the pollution in the city itself.
By taking a part in the realisation of major projects of national importance, Elektromontaža has risen to the occasion and proven its readiness to successfully resolve even the most demanding tasks and to make its contribution to the development of infrastructure which is beyond doubt one of the pillars of economic progress and generator of a common social prosperity.
Other References