Kragujevac Investments
Secondary Distribution Network · Kragujevac, Požarevac, Smederevo · 2016 – 2018
The Kragujevac Investments project was carried out in 2016-2018 across Kragujevac, Požarevac and Smederevo, under investor ODS EPS Distribucija, Kragujevac Branch. It included electrical installation works and procurement of materials for construction and reconstruction of 10(20) and 1 kV power facility connections and measuring points.
Electrical installation works and procurement of materials for construction and reconstruction of 10(20) and 1 kV power facility connections and measuring points – Kragujevac.
Over 150 km of low-voltage network, 100 km of 10 kV power lines, 55 distribution substations, 5000 relocated measuring points and over 2000 household connections were made, which contributed to the improvement of voltage conditions in the distribution networks and the reduction of losses.