Kostolac Wind Farm
Substations · Kostolac · June 2024 – November 2025
The construction project of the Kostolac wind farm was carried out in the period June 2024 – November 2025.
The works included civil, steelwork and electrical works on the 110/35 kV substation, the cable network connecting the substation with the wind turbines, as well as works on connecting the 110 kV power line.
Other References