Equipping field E18 on TS 400/110 kV Belgrade 20

Substations · Belgrade · 2021-2022

The equipping of the E18 110 kV field was done due to the need to connect the 110 kV transmission line between the Vinča thermal power plant and TS Beogard 20, for better utilization of electricity. The project was carried out in 2021-2022 in Belgrade, under investor Beo čista energija doo Beograd.

Equipping field E18

Field E18 on TS 400/110 kV is equipped with three high-voltage bus disconnectors, a high-voltage circuit breaker, a high-voltage measuring transformer, a control and protection cabinet, alterations to the SCADA system and the necessary construction works necessary for the installation of equipment. The equipment was delivered, tested and put into operation.

The importance of equipping the transformer station is to obtain a more reliable, safer and more stable power supply with better voltage. For us as a system, the reduction of electricity losses is important, which is very significant today.