35 kV Power Line between Ralja and Ripanj

Power Lines · Belgrade · 2012 – 2013

Insulation and conductor replacement on the 35 kV Power Line between Ralja and Ripanj was carried out in 2012-2013 in Belgrade, under investor EPS – ED Beograd.

Replacement of existing K3 insulator chains and installation of new rod insulators, disassembly of the existing 70 mm² conductor and installation of a new 95 mm² conductor, tower and phase marking.

The goal is more consistent power supply.