2 x 110 kV Power Line No. 113/1 AB between Niš 2 Substation and Niš 1 Substation

Power Lines · Niš · 2024/2025

The reconstruction project of the 2 × 110 kV power line No. 113/1 AB between Niš 2 Substation and Niš 1 Substation is being carried out for the investor EMS a.d. Belgrade, at the Niš location, with works starting in 2024/2025.