110 kV Power Line No. 1127 between Kraljevo 1 – Kraljevo 2, connection to Kraljevo 6 Substation
Power Lines · Kraljevo · 2017 – 2018
The construction of the 110 kV power line for connection of 110/10 kV Ribnica Substation was carried out in 2017-2018 in Kraljevo, under investor EMS.
Execution of construction works for 2×110 kV power line for connecting 110/10 kV Kraljevo 6 Substation (Ribnica) to the transmission system. The length of the newly constructed power line is 3.5 km. A total of 17 new towers were built, 12 thereof were steel lattice towers of reduced dimensions and 5 tubular polygonal towers. Complete electrical installation works were executed from Kraljevo 6 Substation (Ribnica) to the point of connection to 110 kV power line no. 1127 between Kraljevo 1 and Kraljevo 2.
The construction of this line and substation will create conditions for more intensive development of the area, which is expected and planned in this part of the city. High reliability and security in electricity supply will be provided, which is especially important for further development of Kraljevo, and for the purpose of a more stable operation of Kraljevo’s power system, as well as for long-term provision of electricity to consumers in the area of Kraljevo, respectively Ribnica.
Other References