110 kV Power Line between Kruševac and Dedina node

Power Lines · Kruševac – Dedina · 2014 – 2015

Works on the 110 kV power line between Kruševac and Dedina node were carried out in 2014-2015, under investor Energotehnika Južna Bačka d.o.o. Novi Sad.

Construction of steel lattice barrel-shaped tower structure, 24 pcs. / 125 t, with associated hardware, transport to the site, installation and erecting, and structure anti-corrosion protection by galvanisation and paint. Installation of electrical equipment and conductors.

Replacement of old and dilapidated “Karpoš” towers with new steel lattice towers. In this way, JP Elektromreža Srbije, provides security in the supply of electricity – 110 kV voltage level.