The 110/35/10 kV Tutin substation is a new substation within the distribution area of the town of Tutin.
Increased demand for electricity and power in this area created the need for the construction of a new facility and for raising the voltage level from 35 kV and 10 kV to 110 kV.
Construction period: 2018–2023.