110/10 kV Ljig Substation
Substations · Ljig · 2014 – 2015
Construction of 110/35/10 kV substation, which includes the entire construction part, equipping one 110 kV line bay and entire 35 kV and 10 kV plant. The project involved equipment delivery, installation and testing, carried out in 2014-2015 in Ljig, under investor EPS – Elektrosrbija Kraljevo.
- 110 kV equipment 2 ABB power line circuit breakers;
- 2 TR circuit breakers;
- ABB outgoing feeder and busbar disconnectors;
- ABB current and instrument transformers;
- 35 kV Elektrošumadija plant with ABB protection;
- 10 kV plant with ABB protection.
The project was carried out due to the increase in the capacity of industrial consumers, as well as due to the construction of a new motorway that required the construction of several new 35 kV and 10 kV substations.